Pump Control Valve

PUMP CONTROL VALVE

Product description

ARKOC ARK 973 Series pump control valves; Are control valves designed to automatically activate or de-energize booster (horizontal shaft) type pumps used in water line promotional lines. It is an active check valve that can be fully opened or closed in response to electrical signals. From the moment the pump is started to the start button, the pump cycle is found. When the pump is turned off, the valve closes itself completely. The valve is completely closed. In the event of power failure, the pump control valve acts like an active check valve to prevent backflow to the pump. thus eliminating the need for an extra check valve in the system.

Standard accessories

• Y type mini strainer filter

• Mini ball valve

• On-off speed adjusting valve

• Piston solenoid valves

• Limit switch

• Position indicator shaft

• Mini check valve

Optional accessories

• Flow regulating valve (v-port)

• Large filter

• Stainless or copper signal hoses according to the fluid content (chlorinated etc.)

• Stainless fittings according to the content of the fluid (chlorinated etc.)

• Stainless body

• Pressure hour

• Pressure reducing pilot mechanism

• Pressure locking pilot mechanism

• Electronic controller

Things to be aware of during installation and use

Before installing the valve on the pipeline. the pipeline must be free from large impurities. Absolutely dirt trap should be placed in front of the valve In case of a possible failure. an isolation valve (sliding valve or butterfly valve) must be placed in front of and behind the control valve for faster response. When mounting the valve instead of the lift ring on the should be used Must be assembled according to the arrow direction on the valve cover. Sufficient space must be left around the valve to easily make the necessary settings and maintenance. If the pilot mechanisms and accessories are installed on the valve. care must be taken to prevent possible damage. and it is more appropriate to remove the accessories if they can be reinstalled if possible. Valve can be installed horizontally or vertically on pipeline The electrical connections must be made with isolated and conforming cables Wires should not be creeped in places and should be laid neatly with a protective cover if necessary.

Arkoc Logo